1 Bedroom 1 N wall 180.JPG
Wall due to be insulated internally – the left corner as one looks at it needs plaster off as specified to remove mould growth area and replaster roughly prior to battening out

2 Bed 1 NW corner plaster off 179.JPG
Plaster off from floor to window cill for 1 m either side of corner
then leaving an intact window reveal external corner (25mm miniumum) hack off about 200mm either side of corner up to ceiling level – ie where mould grouth is
Replaster roughly with any old spare render 3:1 sand cement such as to allow for battening out

3 Bed 2 extistingrad keep and add one 0161.JPG See plans for where other recovered rad is to go

4 Bed 2 pedastal 162.JPG new services for DHW and CW to be under floor as per SK plans

5 Bed 3 existing rad MAY be retained or mayuse longFARAL 0155.JPG

6 Bed 3 fanlight removed as well as door 205.JPG CG to liaise with SB as to its replacement

7 Bedroom 3 N wall demo fan light 203.JPG from other side (north)

8 Bed 3 West wall, IT wsa agreed with SB that this would become an alcove 204.JPG

9 Ensuite corridor rad keep0165.JPG

10 Ensuite corridor rad keep166.JPG

11 Sittting room West wall remove wall plaster NW at top where mould growth evident before installing new insulation 167.JPG

12 Rear add East roof battens 163.JPG

13 Sitting room DPC holes194.JPG

14 Sitting room extenson founding 193.JPG