Trialpits

Below is a download link for location plan of trial pits 1 to 6

and a ground loop plan FOR SLINKIES (now redundant) following the site visit in February

http://brynsirol.atics.co.uk/wp-content/uploads/2012/09/bryn_sir_060315_Trial_pits___slinkies_00001.pdf

Photographs of trial pits taken in late Feb

note about 450 mm of top soil and clay below that.

This is likely to be quite conductive  and we estimate it at 30 watts per square m for heat production as it is mostly wet most of the time in winter. Water was ponding when the pits were dug out but had ‘dried’ out with a month of no rain

View of Trial Pit No1  South facing slope in field / front garden

 

Trial Pit No 1

 

 

Trial Pit No 2

 

 

View of trial pit No 3

 

 

Trial pit No. 3 close up – lots of clay water ponding from rain the night before

 

 

Trial Pit No. 4

 

 

 

View of Trial pit No 5

 

Trial pit No 5 with flash